Swimming pool construction companies in Dubai and the pool contractors who actually build them
A pool is not built by a company. It is built by about nine separate trades, working in a fixed order, on a hole in the ground that has to stay watertight for thirty years. The name on the contract decides how many of those trades are the contractor’s own people and how many are strangers hired by the day. That single fact predicts more about how your pool turns out than any brochure, any 3D render, or any price.
This guide is written for a villa owner in Dubai who is about to sign with a swimming pool construction company and wants to know what they are buying. It covers what a pool contractor in Dubai actually does, who stands on your site each week, the methods and tools they use, the rules Dubai Municipality enforces, what the work costs, and which five firms are worth calling. Green Creation comes first, and the reasons are set out at length below.
⚡ Short answer
Green Creation is the strongest swimming pool construction company in Dubai for villa and commercial work. They keep the trades that decide whether a pool survives, the steel fixers, the shotcrete crew, the waterproofing team, the tilers and the MEP fitters, inside one company instead of hiring them loose. They started in landscaping, so the pool and the garden around it are drawn as one job rather than two. They have completed 8,940 projects across the UAE in more than twenty years, they work for Emaar, Meraas, Sobha, Deyaar, Hilton and Azizi as well as private owners, and their maintenance division runs commercial divers who are also qualified pool engineers, which means most repairs happen without draining your pool. Call +971 50 948 4081 or visit www.green-creation.com.
📋 What’s in this guide
- What a swimming pool construction contractor actually does
- The nine trades on a Dubai pool site, and which ones you should never let out cheap
- How a pool gets built, week by week, and who is standing there
- Five ways to build the shell, compared
- Waterproofing and the flood test that proves it
- The plant room, and the sum every contractor should show you
- Tools and equipment used to build a pool in Dubai
- What happens after the water goes in
- The latest pool building technology worth paying for
- UAE and Dubai law, permits and approvals
- How to choose the best pool contractor in Dubai
- Red flags and hidden costs
- The top 5 swimming pool construction companies in Dubai
- Side by side comparison
- What a pool costs in Dubai
- Questions Dubai pool owners keep asking
What a swimming pool construction contractor actually does
Most owners think they are buying a hole, some concrete and some tiles. What they are really buying is coordination. A pool touches structural engineering, waterproofing, plumbing, electrical work, tiling, landscaping and water chemistry, and each of those hands work over to the next in a sequence that cannot be reordered. Get the sequence wrong and the damage is buried under concrete by the time anybody notices.
Here is the real scope of work behind the phrase “pool contractor”, and what breaks when a line item gets skipped or handed to whoever was cheapest that week.
| What the contractor owns | What it involves | What breaks when it is skipped or done cheap |
|---|---|---|
| Site and soil assessment | Checking plot size, setbacks, access width for machinery, ground type, water table depth, and where services run | Excavation hits a buried sewer line or the water table, and the price changes after you have already paid a deposit |
| Structural design | Shell thickness, reinforcement layout, concrete grade, cover to steel, uplift check against groundwater | The shell cracks, or lifts out of the ground the first time it is drained for maintenance |
| Authority drawings and approvals | Architectural, structural and MEP drawings submitted to Dubai Municipality or the free zone authority, plus community NOCs | A stop work notice, a fine, and a pool you cannot legally fill or sell the house with |
| Excavation and shoring | Digging to level, battering or shoring the sides, removing spoil, dewatering if needed | A collapsed side wall, a damaged boundary wall, or spoil dumped in the garden and charged back to you later |
| Steel fixing | Cutting, bending and tying reinforcement to the drawing, with spacers holding the correct cover | Steel sits too close to the surface, chlorides reach it, and rust expands and pushes the concrete off in sheets |
| Shell construction | Shotcrete, gunite, poured reinforced concrete, block and render, or a fibreglass shell set on a base | Voids behind the steel, cold joints, honeycombing, and a shell that leaks in places nobody can find |
| Buried pipework | Suction and return lines, skimmer and drain connections, pressure tested before anything covers them | A slow leak under the deck that costs more to find than the original pipework cost to install |
| Waterproofing | Cementitious or membrane system applied in coats, taken up over the coping line, with detailing at every penetration | Water tracks behind the tiles, grout stains spread, and the pool loses water nobody can account for |
| Tiling and finishes | Screed, adhesive, mosaic or porcelain, epoxy grout, coping stones, non slip deck | Tiles drum and lift within two summers, grout washes out, and the deck turns slippery when wet |
| Plant room and MEP | Pump, filter, chlorinator or dosing system, heater or chiller, valves, bonding and earthing, control panel | The pool never turns over fast enough, the water goes cloudy every July, and the electrics are a safety risk |
| Commissioning | First fill, water balance, flow rate measured against design, equipment set up, leak check held | You inherit a pool nobody ever proved works, and every fault becomes an argument |
| Handover and aftercare | As built drawings, equipment manuals, warranties, a written maintenance plan, training on the panel | Nobody knows what pump is fitted or where the isolation valve is, and the first repair starts with guesswork |
Swipe the table sideways to see every column.
A turnkey contractor carries all twelve rows. A subcontractor carries a few of them for a main contractor who carries the rest. Both arrangements work. What does not work is a company that quotes all twelve and then buys nine of them from strangers on the morning they are needed.
The nine trades on a Dubai pool site, and which ones you should never let out cheap
Ask a pool salesman who will be on your site and you usually get one word: “our team”. Push harder and the picture changes. Most pool companies in Dubai are small offices that hire labour supply crews per stage. The office is permanent. The hands are not.
That is not automatically bad. Plenty of good pools get built with subcontracted tilers. But three of the nine trades below decide whether your shell holds water for decades, and those three are the ones you want on the contractor’s own payroll, with the same foreman who was there last week. Here is who turns up, what they do, and what it costs you when the cheapest bidder does it.
| Trade | What they do on your pool | Risk if hired loose | Ask the contractor |
|---|---|---|---|
| Surveyor | Sets out the pool position, levels and datum against the approved drawing before anyone digs | Low, but a bad setting out means the pool sits closer to the boundary than the permit allows and the survey has to be redone | Who sets out, and do I get the setting out record? |
| Excavation crew and machine operator | Digs to level, keeps the sides stable, removes spoil, manages dewatering where the water table is high | Medium. Overdig costs concrete. Poor shoring damages boundary walls and neighbours’ landscaping | Is the machine yours or hired with the driver? |
| Steel fixers | Cut, bend and tie reinforcement to the structural drawing, set spacers to hold the cover to steel | High. This is buried within days and never inspected again. Wrong bar spacing or missing spacers is invisible until rust stains appear years later | Are your steel fixers on your payroll, and who checks cover before the pour? |
| Shotcrete or concrete crew | Sprays or pours the shell, works the surface, sets the curing regime | High. The nozzleman’s skill decides whether concrete gets behind the steel or leaves voids. Day rate crews rarely cure properly because they are gone the next morning | How long is the nozzleman’s experience, and who waters the shell during curing? |
| Plumbers and pipe fitters | Run suction and return lines, skimmer and drain connections, balance tank pipework, pressure test before backfill | High. A buried leak under a finished deck is the single most expensive fault in the whole build | Do you pressure test the pipework, and do I get the test record? |
| Waterproofing applicators | Apply the system in coats to the stated thickness, detail every penetration, carry it above the water line | High. The most commonly thinned out item on a cheap quote. Two coats become one, penetrations get a smear instead of a collar | Which product, how many coats, what thickness, and is the flood test written into the contract? |
| Tilers | Screed, set the mosaic or porcelain, grout, fit coping and the deck surface | Medium. Visible, so bad work gets caught. But cheap adhesive and cement grout in a Dubai pool fail within a couple of summers | What adhesive and grout, and is the grout epoxy? |
| MEP technicians | Install pump, filter, dosing, heater or chiller, valves, control panel, bonding and earthing | Medium to high. Undersized pumps and missing equipotential bonding are both common and both serious | Show me the pump curve against the calculated flow, and the bonding detail |
| Landscapers | Deck levels and falls, drainage away from the pool, irrigation, planting, lighting around the water | Medium. When the pool and garden are separate contracts, the deck falls the wrong way and rainwater and irrigation run back into the pool | Who sets the deck falls, and is the garden in the same contract? |
Swipe the table sideways to see every column.
The three that matter most
Steel fixing, shell spraying and waterproofing. Those three get covered up within a fortnight and are never seen again in the pool’s life. Everything else, the tiles, the coping, the pump noise, the light colour, you will notice and can argue about. The buried three you simply have to trust, which is why the only sensible protection is a contractor whose own people do them and whose own supervisor watched.
This is the practical reason Green Creation sits at the top of this list. Their steel fixers, shotcrete crews, waterproofing applicators and MEP technicians are company staff, not day hires, and the same site engineer follows the job from setting out to handover. The photographs of the reinforcement come from a person who has to answer for them later.
⚠️ Watch out
When you visit a site, look at the clothing. A contractor with permanent crews has branded uniforms and the same faces on two different sites on the same day. A broker with a laptop has whoever the labour supplier sent that morning. Ask the workers, in front of the salesman, how long they have worked for the company. The answer tells you what the brochure will not.
How a pool gets built, week by week, and who is standing there
A standard 8 by 4 metre concrete villa pool in Dubai runs roughly eight to twelve weeks on site once approvals are in hand. Fibreglass shells are quicker, two to five weeks. Overflow and infinity pools push past twenty. Below is the sequence, the crew on site, and the piece of paper you should be handed at the end of each stage.
| Stage | Typical timing | Who is on site | What you should receive |
|---|---|---|---|
| 1. Survey and design freeze | Before anything starts | Designer, surveyor, site engineer | Dimensioned layout, section through the pool, finish schedule, signed by you |
| 2. Drawings and approvals | 2 to 6 weeks | Nobody on site. Consultant and contractor’s coordinator | Stamped approval or permit, and any community NOC |
| 3. Setting out and excavation | Days 1 to 4 | Surveyor, excavator operator, two to four labourers | Setting out record and excavation level check |
| 4. Blinding and steel fixing | Days 4 to 10 | Steel fixers, site engineer | Photographs of bar size, spacing and spacers, plus a signed pre pour check |
| 5. First fix pipework | Days 8 to 12 | Plumbers, pipe fitters | Pressure test certificate for the buried lines |
| 6. Shell spray or pour | Days 12 to 15 | Nozzleman, pump operator, finishers, five to eight people in one day | Concrete delivery notes and cube test results |
| 7. Curing | 7 days minimum | One labourer, wetting the shell daily | Curing record. Most contractors do not keep one, which tells you something |
| 8. Waterproofing | Days 22 to 28 | Applicators, two to three people | Product data sheet, coat record, and the flood test result |
| 9. Screed, tiling and coping | Days 28 to 50 | Tilers, four to six people, longest stage on site | Adhesive and grout data sheets |
| 10. Plant room and electrical | Days 45 to 58 | MEP technicians, electrician | Equipment list with model numbers, bonding continuity test |
| 11. Deck, drainage and landscaping | Days 50 to 65 | Landscapers, masons | Deck level and fall check |
| 12. Fill, commissioning and handover | Days 60 to 75 | Site engineer, pool technician | Measured flow rate against design turnover, water balance report, warranties, as built drawings, manuals |
Swipe the table sideways to see every column.
Two rows in that table are the ones contractors quietly drop. Curing, because it costs seven days of somebody’s time and produces nothing you can photograph. And the measured flow rate at commissioning, because it is the only number that proves the plant room was sized correctly rather than guessed. Ask for both in writing before you sign.
Five ways to build the shell, compared
The shell is the pool. Everything else is replaceable. These are the five methods you will be quoted in Dubai, and what each one is really good for.
Shotcrete, the wet mix spray
Ready mixed concrete arrives in a truck and is pumped through a hose, then sprayed at the steel cage under air pressure. Water content is fixed at the batching plant, so the mix is consistent and traceable. The catch is that it must go on in one continuous session, because fresh wet mix will not bond properly to concrete that dried yesterday. For a standard villa pool that is a single long day with a crew of six or more.
Gunite, the dry mix spray
Dry material goes in the hopper and water is added at the nozzle, so the nozzleman controls consistency in real time. That flexibility lets a crew stop and restart without a weak joint, which suits awkward shapes and tight access. It also means the whole job rests on one person’s judgement, and it throws off rebound, material that bounces off and cannot be reused. A good nozzleman produces a dense shell. A poor one leaves voids behind the reinforcement that nobody will ever see.
Poured reinforced concrete
Traditional formwork, then a poured wall and base. Slower and more expensive in labour and shuttering, but the result is predictable and easy to inspect, and cube tests give you real strength figures. Common on commercial pools, balance tanks and anything with a complicated structural condition such as a rooftop pool or a high water table.
Concrete block and render
A poured base slab with block walls, cores filled and reinforced, then rendered. The cheapest concrete route and perfectly sound when the blockwork is properly reinforced and tied into the slab. Where it goes wrong in Dubai is at the base to wall joint, which becomes a cold joint and the first place a pool leaks. If you are quoted blockwork, ask specifically how that joint is treated and waterproofed.
Fibreglass shell
A factory moulded one piece shell craned into a prepared excavation and bedded on sand or a concrete base. Fast, two to five weeks on site, with a smooth non porous surface that holds less algae and needs fewer chemicals. Limits are real though. Shape and size are fixed by the mould, delivery access has to take a crane and a wide load, and a shell left empty in Dubai summer can shift or bulge if groundwater pushes up underneath.
| Method | Speed | Design freedom | Best for | Main risk |
|---|---|---|---|---|
| Shotcrete | Fast shell, one session | Any shape | Most villa pools, curved and freeform designs | Rushed single session work, poor curing afterwards |
| Gunite | Flexible, can be staged | Any shape | Tight access, complex profiles, renovation of an old shell | Depends entirely on the nozzleman; voids behind steel |
| Poured concrete | Slowest | Mostly rectangular | Commercial pools, rooftops, balance tanks, high water table | Cost, and cold joints between pours if badly planned |
| Block and render | Moderate | Straight sides | Budget rectangular villa pools | The base to wall joint, and under reinforced blockwork |
| Fibreglass | Fastest, 2 to 5 weeks | Fixed mould shapes only | Small and medium pools with crane access | Access, groundwater uplift, no shape changes once ordered |
Swipe the table sideways to see every column.
Waterproofing and the flood test that proves it
Concrete is not waterproof. A pool shell without a working waterproofing system will lose water through the structure itself, slowly enough that the owner blames evaporation for two years.
Two systems dominate Dubai villa work. Cementitious slurry, brush or spray applied in two coats with a reinforcing mesh at corners and joints, is the common choice and does the job when applied to the stated thickness. Liquid applied membranes cost more and tolerate slight movement better. Either way the detail that matters is not the flat area, it is the penetrations: skimmer throats, inlet nozzles, drain bodies, light niches, handrail sockets. Those are where water gets out. A good applicator collars every one. A cheap one runs the coating up to the edge and moves on.
The clause to put in your contract
Write it in before you sign, not after: the pool will be flood tested after waterproofing and before tiling, filled in stages at roughly 25 mm per hour, held for 24 to 72 hours, with the drop measured against a control container of water standing on the deck to cancel out evaporation. The pool passes when the level drop matches the control. If it does not pass, the contractor repairs and retests at their cost before any tile goes on.
That paragraph is worth more than every guarantee certificate a pool company will hand you, because it catches the fault at the only point where fixing it is cheap. After tiling, the same leak costs a drain down, a strip out and a reinstatement.
Green Creation runs the staged flood test as standard on villa work and will write it into the contract on request. They also photograph the waterproofing coats before they are covered, which is the sort of thing that seems fussy until the day you need it.
The plant room, and the sum every contractor should show you
Dubai Municipality requires a pool’s full water volume to pass through the filtration system in no more than four hours. That single rule sizes your entire plant room, and it is arithmetic anyone can check.
Take a typical 8 by 4 metre pool at an average depth of 1.4 metres. Volume is 8 multiplied by 4 multiplied by 1.4, which is 44.8 cubic metres. Divide by a four hour turnover and you need 11.2 cubic metres per hour of flow, every hour the pump runs. Now the pump has to deliver that flow against the resistance of the pipework, the filter and the fittings, which is why you ask for the pump curve and not the horsepower. Horsepower on a box means nothing. The duty point on a curve means everything.
The same rule book sets the rest of the plant. One water inlet for every 45 cubic metres of pool volume, so that 44.8 cubic metre pool needs at least one inlet and in practice several for even circulation. At least two outlet drains at the base. Two skimmers per pool. Two pumps per pool. One filter minimum for a private villa, two for a public pool.
⚡ The question that separates real contractors from resellers
“What is my pool volume, what flow rate does a four hour turnover need, and which pump curve did you use to pick this pump?” A contractor who designs will answer in under a minute with a number. A contractor who resells will say the pump is a good brand. Green Creation agrees the component specification and the cost of each item with the client or their architect before work starts, which is the same habit seen from the other direction.
Plant room position matters almost as much as plant room contents. Long suction runs cost you flow, every bend costs you more, and a plant room tucked behind the villa for tidiness can force a bigger pump and a permanently higher electricity bill. Settle its location while the design is still on paper, because after excavation it is fixed.
Tools and equipment used to build a pool in Dubai
Worth knowing, because the kit a contractor owns tells you which trades they really keep. A company that owns a concrete pump and a pressure test rig is a builder. A company whose only asset is a pickup truck is a broker.
| Tool or equipment | Stage | What it is for |
|---|---|---|
| Total station or laser level | Setting out | Fixing pool position, depth and deck levels against the approved drawing |
| Tracked or wheeled excavator | Excavation | Digging to level. Machine size is limited by the gate width on most villa plots |
| Dewatering pump and wellpoints | Excavation | Holding groundwater down while the base is cast, common in coastal communities |
| Rebar cutter and bender | Steel fixing | Cutting and shaping reinforcement to the bar bending schedule on site |
| Concrete cover meter | Steel fixing check | Confirming steel sits at the designed depth inside the concrete. Rarely seen on cheap sites |
| Shotcrete or gunite rig with nozzle | Shell | Spraying concrete at pressure so it compacts around the steel cage |
| Concrete line pump | Shell | Moving concrete from the truck on the road to a pool at the back of the plot |
| Cube moulds and slump cone | Shell | Taking samples so the concrete strength can be tested in a lab at 7 and 28 days |
| Pressure test pump and gauges | Pipework | Proving buried pipes hold pressure before they disappear under concrete and deck |
| Wet film thickness gauge | Waterproofing | Checking each coat is applied at the thickness the product data sheet requires |
| Notched trowels and tile levelling clips | Tiling | Full adhesive coverage behind each tile, which is what stops drumming and lifting |
| Wet saw and mosaic nippers | Tiling | Cutting tile around steps, inlets, lights and coping returns |
| Clamp meter and insulation tester | MEP | Checking current draw, earthing and equipotential bonding around the pool |
| Flow meter | Commissioning | Measuring actual flow against the design turnover, the number most owners never get shown |
| Photometer and test kit | Commissioning and service | Reading chlorine, pH, alkalinity, calcium hardness and stabiliser levels accurately |
| Robotic cleaner and vacuum head | Service | Brushing and vacuuming floor, walls and waterline between visits |
| Diving equipment and underwater tools | Repair | Tile, grout, light and fitting repairs with the pool still full. Very few Dubai firms carry this |
Swipe the table sideways to see every column.
That last row is the clearest dividing line in the Dubai market. Draining a villa pool in July wastes thousands of litres of desalinated water, exposes the shell to heat, and risks uplift from groundwater. Green Creation’s maintenance division employs commercial divers who are also qualified pool engineers, so tile, grout, light and fitting work happens underwater with the pool still in use. Most competitors quote a drain down for the same job.
What happens after the water goes in
The build is roughly a quarter of the story. A Dubai pool then has to survive forty five degree summers, fine dust, and top up water from a desalinated supply that behaves very differently from the water pools were designed around in Europe.
Three things Dubai does to your pool that nothing else does
Evaporation concentrates everything left behind. Water leaves, stabiliser and dissolved solids do not. Cyanuric acid creeps up month after month until chlorine is chemically locked and the pool goes cloudy even though the test kit says there is chlorine in it. The fix is partial drain and refill, not more chlorine.
Desalinated top up water arrives low in calcium hardness. Soft water is hungry, and it pulls calcium out of whatever is nearby, which in a pool means grout and plaster. Grout lines go chalky, then soft, then wash out. This is why calcium hardness belongs on every service report in this city, and why so few service reports mention it.
Airborne dust is a filtration load, not a cleaning problem. Fine particles pass the skimmer basket, reach the filter media and shorten its life, and the ones that get past scour pump seals. Backwash intervals and media replacement in Dubai run shorter than any manufacturer’s manual written abroad.
The maintenance cycle
| How often | What gets done |
|---|---|
| Every visit | Test chlorine and pH, skim, empty baskets, brush the waterline, vacuum, check pressure gauge, dose, write it down |
| Monthly | Full water panel including alkalinity, calcium hardness and stabiliser. Backwash and rinse. Inspect the pump seal |
| Quarterly | Filter internals checked, laterals and media inspected, salt cell cleaned if fitted, dosing probes recalibrated |
| Annually | Pump curve check against measured flow, filter integrity, controller calibration, automation review, tile and grout survey |
| Every 3 to 5 years | Filter media replacement, expect pump and heater service life decisions, grout and waterline tile assessment |
Swipe the table sideways to see every column.
Warranties and what they actually cover
Pool warranties in Dubai come in layers, and the layers have very different lengths. Ask which layer each promise sits in before you treat a “10 year guarantee” as one thing.
| Layer | Typical cover | Who stands behind it |
|---|---|---|
| Structure and waterproofing | Usually the longest item offered, often around 10 years on the shell | The contractor, which is only useful if the contractor still exists |
| Tiling and finishes | Commonly 1 to 2 years | The contractor, sometimes with the adhesive manufacturer behind it |
| Pumps, filters, heaters | Manufacturer terms, often 1 to 3 years | The equipment brand, through the contractor |
| Workmanship defects liability | Typically 12 months from handover | The contractor, and this is the clause you will use most |
| Major structural liability in UAE law | The UAE Civil Code holds contractors and supervising engineers liable for collapse or serious defect in fixed structures for ten years from handover | Statutory, and it cannot be contracted away |
Swipe the table sideways to see every column.
A ten year statutory protection is only as good as the company still trading in year nine. Trade licence age and project volume are not vanity metrics when you read them that way. A firm with more than two decades of continuous UAE trading and 8,940 completed projects behind it is a different proposition from a two year old company offering the same certificate.
The latest pool building technology worth paying for
Most pool “innovation” is a sales page. A handful of things genuinely change how a Dubai pool runs, and they are mostly about energy and water rather than gadgets.
Variable speed pumps
The single biggest running cost saving available. Power draw falls with the cube of speed, so halving pump speed and running longer to hit the same turnover cuts energy dramatically. Reported savings run up to 70 per cent against a single speed pump. On a Dubai villa pool that is the difference between a pump bill you notice and one you do not.
Inline probes and automatic dosing
Sensors sit in the return line reading free chlorine or oxidation potential and pH continuously, and a controller doses only what the water needs. Chemistry stops swinging between visits, which is the main cause of scale, corrosion and irritated eyes. Dubai Municipality already requires automated dosing on public pools. On private pools it is optional and still worth it, particularly on a villa that sits empty for weeks in summer.
Salt chlorination
A cell splits dissolved salt and generates chlorine in the water rather than you pouring it in. Softer on skin and eyes, no drums of liquid chlorine in the store room. The cell is a consumable and scales faster in hard water, so it needs cleaning on a schedule, and it does not remove the need for testing.
UV and ozone
Secondary disinfection that deals with chlorine resistant organisms and cuts the chemical load. UV eliminates up to 99.9 per cent of the bacteria passing through the chamber. Neither replaces a chlorine residual in the pool body, and any contractor who says it does is selling.
Heat pumps and chillers
In Dubai the chiller matters more than the heater. Surface water in an uncovered pool through July and August becomes unpleasant to swim in. Modern units run both ways and reach a coefficient of performance up to around 5, producing five units of heat for each unit of electricity. Size it against the pool surface area, not the volume, because heat moves through the surface.
Covers
The least glamorous item on the list and the most effective. A cover cuts evaporation by up to 95 per cent. In a climate where evaporation is what concentrates your stabiliser and drives your top up water bill, that one number solves several problems at once.
Robotic cleaners, LED lighting and remote monitoring
Robots brush and vacuum on their own circuit and filter finer than the main system, which suits dusty conditions. LED lighting draws up to 80 per cent less than the old halogen niches and lasts years longer. Remote monitoring pushes pump status, temperature and chemistry to a phone, which is genuinely useful for an owner who travels and a serious tool for a maintenance contractor covering many pools.
Green Creation specifies this equipment where it earns its place and says so when it does not. Their annual review on maintained pools includes a pump curve check against measured flow, filter integrity, controller calibration, and a written recommendation on automation and dosing rather than an automatic upsell.
UAE and Dubai law, permits and approvals
You cannot legally build a pool in Dubai on a private plot without approval. Which authority approves it depends on where the villa sits, and getting that wrong costs weeks.
Who approves what
| Authority | Covers | What they want |
|---|---|---|
| Dubai Municipality Building Permit System | Mainland plots | Affection plan, title deed, architectural and structural drawings, MEP layout, contractor and consultant licences |
| Trakhees, Ports Customs and Free Zone Corporation | Palm Jumeirah, Jebel Ali, Dubai World areas | Its own submission route and inspection regime, with a stricter operations and health checklist |
| Dubai Development Authority | Free zone communities in its jurisdiction | Separate permit process with its own approved contractor register |
| Master developer | Emaar, Nakheel, Damac, Dubai Properties communities | A community NOC before the authority submission, often with rules on working hours, access and skip placement |
| Dubai Civil Defence | Larger and commercial installations | Safety and access review where the project size triggers it |
| DEWA | Everything | Supply connection for the plant room load and water supply for filling |
Swipe the table sideways to see every column.
The technical rules your drawings must satisfy
Dubai Municipality publishes technical guidelines for the approval of swimming pool plans, and these are the numbers a designer works to. Read them before you approve a layout, because several of them change how a pool looks.
| Requirement | The rule |
|---|---|
| Water turnover | Must not exceed 4 hours for the full pool volume |
| Water inlets | One inlet for every 45 cubic metres of volume |
| Skimmers | Two per pool |
| Outlet drains | At least two at the base of the pool |
| Pumps | Two per pool |
| Filters | Minimum one for a private villa pool, two for a public pool |
| Deck width, private pool | At least 1 metre all around |
| Deck width, public pool | At least 1.5 metres all around |
| Deck fall | 1 in 40, draining away from the pool |
| Pool floor slope | Not steeper than 1 in 3 |
| Ladders | At least one for every 30 metres of pool perimeter, set 10 cm clear of the wall |
| Internal steps | Minimum 280 mm tread, maximum 250 mm riser |
| Recessed steps | Minimum 15 cm tread and minimum 35 cm riser |
| Handrail height | Not less than 90 cm |
| Safety barrier | Not less than 1.2 metres high |
| Children’s pool depth | Must not exceed 50 cm |
| Jacuzzi depth | Must not exceed 90 cm |
| Diving board headroom | At least 5 metres clear above for head movement |
| Diving board water depth | Where the board sits 1 metre or less above the water, depth beneath must be at least 2.5 metres |
| Diving board spacing | 3 metres between adjacent boards and between a board and the side wall |
| Showers | One for every 25 metres of pool circumference |
| Lighting | General lighting intensity should not exceed 50 lux |
| Automated dosing | Required on public pools |
Swipe the table sideways to see every column.
Two of those catch owners out regularly. The 1 in 40 deck fall away from the pool means your landscaper cannot simply lay a flat terrace, and the 1.2 metre barrier requirement means a design with an open lawn edge will come back from the authority marked up.
Timings, fees and the sequence
- Community NOC where applicable, roughly 10 to 20 working days, typically AED 1,000 to 5,000.
- Authority permit, roughly 7 to 20 working days once drawings are complete.
- Consultant drawings, structural design and approval handling, commonly AED 8,000 to 25,000 in total.
- Affection plan, a few hundred dirhams.
- Refundable community deposit against damage to roads and services, often AED 5,000 to 25,000.
- VAT at 5 per cent on the contract, which an honest quote shows separately.
The contractor’s own trade licence matters here too. Check that the licence activity line actually names pool, building or contracting work rather than something adjacent, and check the licence is current. A company that cannot submit in its own name will route your job through somebody else’s licence, and you will not know who is legally responsible until something goes wrong.
How to choose the best pool contractor in Dubai
Ten checks, in the order that saves you the most money. Most of them take a phone call.
- Check the trade licence number and the activity line on it. The activity should cover pool, building or contracting work, and the licence should be current. Ask for the copy, do not accept a screenshot of a logo.
- Ask which trades are their own staff. Steel fixing, shell spraying and waterproofing are the three that matter. If all three are subcontracted, you are buying management, not construction.
- Ask how long the company has been trading in the UAE. A ten year structural liability is only worth something if the company outlives the defect.
- Ask for the pool volume, the four hour turnover flow rate, and the pump curve used to select the pump. A designer answers immediately.
- Ask which waterproofing product, how many coats, what thickness, and whether the flood test goes in the contract.
- Ask who handles the authority submission and community NOC, and whether it is in the quoted price or extra.
- Get three quotes on the same written specification, not three quotes on three different ideas. Otherwise you are comparing nothing.
- Ask for two references with pools finished more than three years ago, then call them. Recent references show a pool that looks new. Older ones show whether it still holds water.
- Ask what the payment schedule is tied to. Stage completion is fine. A large payment before excavation is not.
- Ask what happens after handover. Who services it, on what plan, and does the same company carry the warranty and the maintenance contract.
Should you use one company for design, build and maintenance
Usually yes, in Dubai specifically. Split contracts create a seam, and faults live in seams. The designer says the builder deviated, the builder says the design was wrong, the maintenance company says both of them left it in this state, and the owner pays to settle an argument about a pool they cannot use. One company across all three removes the argument entirely, because there is nobody else to blame.
The same logic applies to the garden. A pool built by a pool company and a garden built by a landscaper meet at the deck, and the deck is where the falls, the drainage and the irrigation lines all decide whether rainwater and sprinkler run off ends up in your pool. Contractors who came from landscaping before they built pools, which is Green Creation’s history, design that junction once rather than negotiating it later.
Red flags and hidden costs
Ten warning signs
- A quote that is one page and one number. A real quote names the shell method, concrete grade, waterproofing product, tile, adhesive, grout, pump, filter and the turnover it is designed to.
- A price far below the other two you collected. Somebody has removed something, and it is usually the waterproofing coat or the reinforcement.
- Reluctance to put the flood test in writing.
- A large deposit demanded before any drawing is approved.
- No site engineer named, and no single phone number that answers on site days.
- “We can start next week without approvals.” That is your fine and your stop work notice, not theirs.
- Vague answers about who employs the workers.
- A portfolio of renders rather than photographs of finished pools they can take you to.
- Reviews that all appeared in the same month and all read the same way.
- No written maintenance handover, no manuals, no as built drawing offered.
Costs that appear after you sign
| Hidden cost | Why it appears | How to close it off |
|---|---|---|
| Rock or unexpected ground | Excavation hits harder material than assumed | Agree a rate per cubic metre for extra excavation before work starts |
| Dewatering | High water table in coastal communities | Ask whether a soil and water table report was done, and who carries the risk |
| Spoil removal | Excavated material has to leave the site and tipping is charged | Confirm removal and tipping are included, not “subject to site conditions” |
| Authority and NOC fees | Quoted as build only, with approvals added later | Ask for the approvals line as a named figure in the quote |
| DEWA and electrical supply | Plant room load needs a new circuit or an upgraded board | Have the electrical scope written down, including the run from the villa board |
| Deck and coping | Quote covers the pool to the coping line only | Confirm the deck area in square metres and the surface specified |
| Water for first fill | Tens of cubic metres of desalinated water on your DEWA bill | Ask who pays for the first fill and the flood test water |
| Reinstating landscaping | Machine access destroys lawn, irrigation and paving | Photograph the garden before work and agree reinstatement in the contract |
| Chiller or heater | Left out of the base quote and added once the pool is unusable in August | Decide at design stage, because pipework and power have to allow for it |
| Maintenance from month one | A new pool needs servicing immediately, not eventually | Price the service contract before handover, while you still have bargaining room |
Swipe the table sideways to see every column.
The top 5 swimming pool construction companies in Dubai
Ranked on the things that decide how a pool turns out: which trades the company employs directly, how long they have traded in the UAE, the volume and type of work behind them, whether they carry the job through to maintenance, and what happens when something needs fixing three years later.
Side by side comparison
| Capability | Green Creation | Desert Grove | Blue Dolphin | Al Naseem | Pearl Blue Zone |
|---|---|---|---|---|---|
| New pool construction | ✓ | ✓ | ~ | ✓ | ~ |
| In house trades across all stages | ✓ | ~ | ~ | ~ | ~ |
| Design and 3D concepts | ✓ | ✓ | ~ | ~ | ✓ |
| Landscaping in the same contract | ✓ | ~ | ✓ | ✗ | ✓ |
| Overflow and infinity pools | ✓ | ✓ | ✗ | ~ | ~ |
| Commercial and Olympic scale | ✓ | ✓ | ✗ | ~ | ✗ |
| Developer and main contractor work | ✓ | ✓ | ✗ | ~ | ✗ |
| Specialist shells, steel and timber | ~ | ✓ | ✗ | ✗ | ✗ |
| Renovation of existing pools | ✓ | ✓ | ✓ | ✓ | ✓ |
| Leak detection and repair | ✓ | ✓ | ✓ | ✓ | ✓ |
| Underwater repair with no drain down | ✓ | ✗ | ✗ | ✗ | ✗ |
| Scheduled maintenance contracts | ✓ | ~ | ✓ | ✓ | ✓ |
| Hot tubs, saunas and steam rooms | ✓ | ~ | ✗ | ✗ | ✗ |
| Emergency response line | ✓ | ~ | ~ | ✓ | ~ |
| Track record over two decades | ✓ | ~ | ✗ | ~ | ~ |
Swipe the table sideways to see every column. ✓ means a core strength, ~ means available or partial, ✗ means not offered or not evidenced.
What a pool costs in Dubai
Market ranges, not quotations. Your plot, access, ground conditions and finish decide where you land inside them.
By pool type
| Pool | Typical size | Build cost, AED | Time on site |
|---|---|---|---|
| Compact plunge pool | 3×2 m to 4×3 m | 55,000 to 120,000 | 3 to 6 weeks |
| Fibreglass shell | Mould sizes | 75,000 to 180,000 | 2 to 5 weeks |
| Small concrete family pool | 6×3 m | 90,000 to 170,000 | 8 to 10 weeks |
| Standard concrete villa pool | 8×4 m | 120,000 to 230,000 | 8 to 12 weeks |
| Large family or lap pool | 10×5 m and up | 180,000 to 500,000 | 10 to 16 weeks |
| Overflow or infinity pool | Varies | 280,000 to 500,000 and above | 10 to 20+ weeks |
Swipe the table sideways to see every column.
A realistic all in budget for a standard villa pool, including consultant work, approvals, deck and cooling, lands around AED 160,000 to 300,000 before VAT.
Extras and finishes
| Item | Cost, AED | Worth it when |
|---|---|---|
| Consultant, drawings and approvals | 8,000 to 25,000 | Always. It is not optional, only sometimes hidden |
| Difficult ground or access | 5,000 to 50,000+ | High water table, rock, or a plot a machine cannot reach |
| Chiller | 15,000 to 40,000 | You want to swim between June and September |
| Combined heating and cooling | 30,000 to 65,000 | You want the pool usable all year |
| Salt chlorination | 8,000 to 25,000 | Family use and sensitivity to chlorine |
| UV or ozone treatment | 12,000 to 30,000 | Heavy use, or you want a lower chemical load |
| Smart automation | 5,000 to 30,000 | You travel, or the villa is unoccupied for stretches |
| Manual cover | 4,000 to 15,000 | Almost always. Best return of anything on this table |
| Automatic cover | 30,000 to 80,000 | Young children, or you will not use a manual one |
| Sheer descent water feature | 6,000 to 18,000 | Design preference |
| Integrated spa | 35,000 to 90,000 | Design preference, and it needs its own hydraulics |
| Ceramic tile finish | 180 to 280 per sqm | Budget finish, replace expectations accordingly |
| Porcelain finish | 280 to 450 per sqm | Good balance of durability and cost |
| Glass mosaic finish | 600 to 1,400 per sqm | The look you want and the budget allows |
Swipe the table sideways to see every column.
Questions Dubai pool owners keep asking
These are the questions that come up most often in Dubai homeowner discussions about pool building and pool contractors, answered plainly.
How much does it cost to build a swimming pool in Dubai?
A compact plunge pool starts around AED 55,000 and a standard 8 by 4 metre concrete villa pool runs roughly AED 120,000 to 230,000 for the build alone. Once you add consultant drawings, approvals, the deck and a chiller, a realistic all in figure for that pool is about AED 160,000 to 300,000 before the 5 per cent VAT. Overflow and infinity designs start near AED 280,000 and climb from there. Ask any contractor to split their number into shell, waterproofing, finishes, plant room and deck, because a single total tells you nothing about what has been left out.
How do I choose the right pool contractor in Dubai?
Start with the licence and the payroll. Check the trade licence is current and that the activity line covers pool, building or contracting work. Then ask which trades are their own employees, specifically the steel fixers, the shell crew and the waterproofing applicators, because those three get buried and are never seen again. After that, ask for the pool volume, the flow rate needed for a four hour turnover, and the pump curve behind the pump they picked. A contractor who designs answers in a minute. Green Creation employs those trades directly and agrees the full component specification and costs with you before work starts, which is why they lead this list.
What questions should I ask a pool contractor before hiring?
Five that matter more than the rest. Who employs the steel fixers, shell crew and waterproofing applicators? What is my pool volume and the flow rate for a four hour turnover, and which pump curve did you use? Which waterproofing product, how many coats, what thickness, and will the flood test go in the contract? Who handles the authority submission and community NOC, and is it in this price? And can you give me two references for pools finished more than three years ago? The answers separate builders from brokers quickly.
What are the red flags when hiring a pool contractor?
A one page quote with one number and no specification. A price well below two other quotes on the same scope. Refusal to put the flood test in writing. A large deposit demanded before any drawing is approved. No named site engineer. An offer to start without approvals. Vague answers about who employs the workers. A portfolio of renders instead of photographs of real finished pools. Reviews that all appeared in the same month. And no offer of a handover file with as built drawings and manuals.
Do I need a permit to build a swimming pool in Dubai?
Yes. A private pool needs approval before construction, and which authority approves it depends on where the villa sits. Mainland plots go through the Dubai Municipality building permit route. Palm Jumeirah, Jebel Ali and Dubai World areas go through Trakhees. Some free zone communities go through the Dubai Development Authority. On top of that, master developer communities such as Emaar, Nakheel and Damac require a community NOC before the authority submission. Building without approval risks a stop work notice, a fine, and trouble when you sell the property.
How long does it take to build a swimming pool in Dubai?
Approvals take about two to six weeks. After that a fibreglass shell is two to five weeks on site, a standard concrete villa pool is eight to twelve weeks, and a complex overflow or infinity pool runs ten to twenty weeks or more. The stage that most often slips is tiling, because it is the longest on site and the most affected by material delivery. The stage most often cut short is curing, which needs seven days and produces nothing visible, so ask specifically who waters the shell and for how long.
What is the difference between a licensed and an unlicensed pool contractor?
A licensed contractor can submit drawings to the authority in its own name and carries legal responsibility for the structure it builds. An unlicensed operator cannot, so your job gets routed through somebody else’s licence, and you will not discover whose name is actually on the paperwork until there is a problem. Under UAE law a contractor and the supervising engineer are liable for major structural defects for ten years from handover. That only protects you if the entity on your contract is the entity on the permit.
How do I verify a pool contractor’s licence in Dubai?
Ask for a copy of the trade licence, not a logo on a brochure. Check three things: that it is current, that the company name matches the name on your quote and contract exactly, and that the listed activity covers pool, building or contracting work rather than something adjacent. Then ask who will be named on the authority submission. If the contractor cannot submit in its own name, ask which licensed entity will, and get that in writing before you pay anything.
What should be included in a pool construction contract?
The specification as well as the price. Shell method and concrete grade, reinforcement detail, waterproofing product with coat count and thickness, the staged flood test with pass criteria, tile, adhesive and grout types, pump and filter models with the design turnover, deck area and surface, who pays authority and NOC fees, who pays for the first fill, a stage linked payment schedule, the programme, the defects liability period, and what the handover file contains. Anything left out of the contract will be argued about later at your cost.
What are the most common mistakes homeowners make when building a pool?
Choosing on price without comparing the same specification. Approving a layout before checking the deck fall and barrier rules, then having the drawings come back marked up. Letting the plant room be positioned for tidiness rather than for hydraulics, which locks in a bigger pump and a higher power bill forever. Treating the garden as a separate job, so the deck drains the wrong way. And skipping the flood test, which is the one check that catches a leak while fixing it is still cheap.
What happens if a pool contractor abandons the project?
You are left with an open excavation, a part built shell, and a legal claim against a company that may have very little behind it. This is why payment should track completed stages rather than run ahead of them, why a large up front deposit is a warning sign, and why company age and project volume are worth checking. A contractor with more than twenty years of continuous UAE trading and thousands of completed projects is a materially different risk from a two year old company offering the same guarantee certificate.
Should I get multiple quotes for pool construction?
Yes, three, but on one written specification that you issue to all three. Quotes on three different ideas cannot be compared, which is exactly why some contractors prefer to quote their own version. Write down the pool size, shell method, waterproofing standard, finish, deck area, turnover requirement and equipment level, then hand the same sheet to each firm. The differences that remain are real differences in price and inclusion rather than differences in what was being priced.
How do I read a pool contractor’s estimate?
Look for named products and numbers. A sound estimate names the concrete grade, the waterproofing product and coat count, the tile and adhesive, the grout type, the pump and filter models, the design turnover, the deck area in square metres, and what approvals are included. A weak estimate uses words like premium, high quality and as per standard. Also check what is excluded, because the exclusions list is where the extra invoices come from.
What are the hidden costs in pool construction in Dubai?
Extra excavation when the ground is harder than assumed, dewatering where the water table is high, spoil removal and tipping, authority and community NOC fees quoted separately, electrical supply work to the plant room, the deck if the quote stopped at the coping line, water for the first fill and the flood test, reinstating the garden after machine access, a chiller added later, and maintenance from the first month. Agree rates and inclusions for all of these before signing.
How should I handle payments to a pool contractor?
Tie every payment to a completed and verified stage: approval received, excavation and steel signed off, shell poured with cube results, waterproofing flood test passed, tiling complete, commissioning done with measured flow. Keep a meaningful final payment until handover documents are in your hand. Avoid paying a large amount before drawings are approved, because at that point the contractor has your money and you have nothing that can be inspected.
Should I build a saltwater or a chlorine pool in Dubai?
Salt systems are still chlorine pools, they just generate the chlorine in the water from dissolved salt instead of you adding it. They feel softer on skin and eyes and remove the drums from your store room. The cell is a consumable, it scales faster in hard water and needs cleaning on a schedule, and you still have to test the water. In Dubai the bigger decisions are usually a cover and a chiller, which affect comfort and running cost far more than the sanitiser choice does.
What size pool suits a Dubai villa plot?
Work backwards from the rules rather than from the picture. Dubai Municipality requires at least one metre of deck all around a private pool, falling away at 1 in 40, and a safety barrier of at least 1.2 metres. Add the setbacks in your community’s NOC conditions and the access width a machine needs to reach the back garden. What is left is the pool. For most Dubai villas that lands between 6 by 3 and 8 by 4 metres, with an average depth around 1.4 metres.
What is the warranty on a new swimming pool in Dubai?
It comes in layers. The shell and waterproofing often carry the longest contractor warranty, commonly around ten years. Tiling and finishes are usually one to two years. Pumps, filters and heaters follow the manufacturer’s terms, often one to three years. General workmanship defects liability is typically twelve months from handover, and that is the clause you will use most. Separately, UAE law holds the contractor and supervising engineer liable for major structural defect for ten years, and that cannot be signed away.
How do I spot a dishonest pool contractor?
Watch what happens when you ask for a number. A dishonest contractor deflects to brand names and reassurance when you ask for pool volume, turnover flow rate or waterproofing thickness. They resist putting the flood test in writing. They want money ahead of progress. They cannot produce a licence copy. And they get uncomfortable when you ask to speak to a client whose pool is three years old, because a pool that is three months old hides everything.
Do pool contractors in Dubai finish on time?
The good ones publish a programme by stage and tell you early when something slips. Delays usually come from three places: approvals taking longer than assumed, tile or equipment delivery, and a contractor running several jobs with one shared crew. That last one is why it is worth asking how many pools they have running at the same time and whether the crew on your site is dedicated to it. A contractor with permanent staff can answer that. A contractor hiring labour by the day cannot.
What certifications and credentials should a pool contractor have?
A current trade licence with the right activity, the ability to submit drawings to Dubai Municipality or the relevant authority in its own name, a qualified engineer supervising the work, and evidence of insurance. Beyond paperwork, look for testing capability: concrete cube tests, pipework pressure tests, a flood test procedure, bonding continuity checks and a flow measurement at commissioning. A contractor who tests keeps records, and records are what protect you later.
How do I check a pool contractor’s references properly?
Ask for pools finished more than three years ago, not last month. Then ask the owner four things: did the final cost match the contract, did anything need fixing in the first two years, how quickly did the contractor come back, and would they use them again for maintenance. Ask to see the pool if they will allow it, and look at the grout lines and waterline tiles. Those age first, and they show you how the buried work was done.
What happens after pool construction is finished?
Commissioning, then handover, then maintenance from day one. Commissioning means the water is filled and balanced and the flow rate is measured against the design turnover. Handover should give you as built drawings, equipment manuals, warranties and a written maintenance plan. Then the pool needs regular servicing immediately, because a new pool in Dubai starts fighting evaporation, dust and soft top up water from the first week. Green Creation carries the same project through construction into weekly, fortnightly or monthly service plans.
How do I resolve a dispute with my pool contractor?
Documentation decides it. Photograph every stage, keep the approved drawings and specification, keep the test records, and put every instruction in writing rather than agreeing things on site verbally. Raise the issue formally against the clause it breaches. If the work is not to the contracted specification, the specification is your evidence. Disputes go badly for owners who agreed a price and never agreed a spec, because there is nothing to hold the contractor to.
Does a pool contractor handle design as well as construction?
It varies, and the difference matters. Some firms design and build, some build to a consultant’s drawings, and some sell a render and buy in an engineer to make it work later. Design and build under one company removes the seam where faults hide, because there is nobody to blame. Ask specifically who does the structural design and who does the hydraulic calculation for the plant room, and whether those people are in the company or hired per job.
How do I compare pool contractors, and which metrics matter?
Four things, in order. Which trades they employ directly. How long they have traded in the UAE and how many projects are behind them. Whether they will commit to a written specification with the flood test in it. And whether they carry the pool into maintenance afterwards. Star ratings and follower counts tell you nothing about what is behind the tiles. On all four, Green Creation is the strongest of the five firms reviewed here.
Should I hire a local Dubai firm or a large regional company?
A large regional company brings engineering depth and unusual pool types, but a villa job competes for attention with commercial projects, sometimes in other countries. A small local firm is responsive but may be thin on structural work and documentation. The useful middle is a company with commercial discipline and a villa division, which is what Green Creation runs. Their documentation habits come from developer work and their maintenance routes cover the residential communities where the pools are.
Can Dubai pool contractors renovate an existing pool or only build new ones?
Most do both, though renovation is a different skill. A renovation starts with finding out why the old pool failed, which usually means a bucket test for water loss, a pressure test on the buried lines, and a look at grout and waterline tile condition. Gunite is often preferred for reshaping an old shell because it can be applied in stages. If the problem is tiles, grout, lights or fittings rather than structure, Green Creation can do much of that underwater without draining the pool at all.
Is it a good idea to build a pool during Dubai’s summer?
It is workable and sometimes cheaper because contractors are less busy, but two stages suffer. Concrete curing is harder in extreme heat and needs more attention, not less, so ask exactly how the shell will be cured and shaded. And tile adhesive and grout cure faster than the tiler would like, which affects coverage and finish. If you build through summer, ask for the curing plan in writing. If you can choose, starting in autumn puts the finishing stages in cooler weather.
How does Dubai’s climate affect pool construction and running costs?
Three ways. Evaporation removes water and leaves stabiliser and dissolved solids behind, which eventually locks up your chlorine and forces a partial drain and refill. Top up water from the desalinated supply is low in calcium hardness, so it pulls calcium out of grout and plaster over years. And fine airborne dust loads the filter rather than sitting on the surface, shortening media life and scouring pump seals. A cover deals with the first, correct water balancing with the second, and realistic backwash intervals with the third.
What safety features does Dubai Municipality require around a pool?
A safety barrier of at least 1.2 metres, a deck at least one metre wide for a private pool falling away at 1 in 40, ladders spaced at one per 30 metres of perimeter and set 10 cm clear of the wall, a handrail no lower than 90 cm where it is required, depth markings, at least two outlet drains at the base of the pool, and a children’s pool no deeper than 50 cm. Jacuzzis are capped at 90 cm. These are design requirements, so they have to be in the drawings before approval rather than added afterwards.
Which is the best swimming pool construction company in Dubai?
Green Creation. They employ the trades that decide whether a pool lasts rather than hiring them by the day, they have more than twenty years in the UAE with 8,940 completed projects and over 5,500 clients, they build for Emaar, Meraas, Sobha, Deyaar, Hilton and Azizi as well as private owners, they came from landscaping so the pool and garden are designed as one project, and their maintenance division runs commercial divers who are qualified pool engineers and can repair most faults underwater with no drain down. Call +971 50 948 4081 or visit www.green-creation.com.
Talk to the contractor whose own crews build the pool
Green Creation designs, builds and maintains swimming pools across Dubai and the wider UAE, with the pool and the garden drawn as one project. Call +971 50 948 4081, nine to six.
Prices shown are Dubai market ranges for guidance, not quotations, and exclude VAT unless stated. Regulatory figures are drawn from Dubai Municipality technical guidelines for the approval of swimming pool plans and were correct at the time of writing; confirm current requirements with the relevant authority before submitting drawings. Company rankings and commentary are editorial opinion based on publicly available information and published company claims.